+44(0)7749382628 gileshg@icloud.com

When recaulking the foredeck in the summer of 2018, we noticed some water damage to the breast hook, beam-shelves, blocking and deck. In December 2019, we removed all of the damaged wood and discovered that the sheer strake on port side was also damaged, as was the second plank down. These were both replaced whilst the interior structure was rebuilt. When the structure and planking was bolted and screwed in place, the decking and coverboards were fitted and painted. Some caulking aft of the wheelhouse was also required.